RIVER CONNECTIVITY

West River Park, Truckee

The project is a 1.4-acre planned park and riparian edge restoration project on West River Street in downtown Truckee, CA.


The project goals included the following:

  • Provide a passive park with public river access
    Restoration of riparian edge with native plantings
  • Education and interpretative panels
  • Public open, social space
  • Riverfront access & activated riverfront play
  • Multi-Use Site
    • Park Facility
    • River-oriented commercial
    • River Access
    • Stormwater Treatment
    • Connectivity
    • Expansion of Downtown
    • To Legacy trail bridge & trail
    • To Downtown core and to natural open space & river
  • Greenhouse benefits – air, habitat and water quality
  • Catalyst for riverfront development

NEIGHBORHOOD PARK

Eastern Oak Park, Sacramento

The design included: the addition of an old YMCA property to the existing park; renovation of the combined space to convert turf areas to drought tolerant landscape; turning an old tennis court into pickle ball courts and the addition of a restroom, futsal / basketball courts, exercise stations, playgrounds, a community plaza and shade structures. MDG services included Master Plan, Public Outreach, Construction Documents and Bid and Construction Administration. When the park opened, it was instantly a big hit with the community, especially the playground. With the reduction in unused turf areas, the District is saving largely on the water and maintenance costs.

SPORTS COMPLEX

DeGarmo Park, Chico

DeGarmo Park is a 36-acre Sports Park Master Plan. We completed both phase I and phase II construction documents and construction administration. The Gailey Luther DeGarmo park site was previously owned by the DeGarmo family. MDG captured the history of the site in barn-styled shade structures and a barn-red color theme. Decorative steel rails were designed throughout the park to represent local butte bluffs, rice fields and orchards.

  • Phase 1 developed 10 acres including: a parking lot with a bio-filtration system; multi-use athletic fields – two soccer and three softball; a picnic shelter and restrooms.
  • Phase 2 developed 12 acres with additional parking, two soccer fields, a playground and a group picnic area. With all of the completed phases, the park covers 36 acres. The sports theme of the park provides opportunities for both kids and adults to get into the fun and unite with healthy competition.
Melton Design Group designed Degarmo Park in Chico, CA.  This neighborhood park features, soccer fields, baseball fields, play structures, picnic areas, walking paths and unique shade structures.

REGIONAL PARK

Riverbend Park, Oroville

WINNER OF THE 2021 CPRS DESIGN EXCELLENCE AWARD FOR PARK PLANNING

Riverbend Park included Riverfront Park Renovation, Master Plan design through Construction Administration. Also, the facilitation and collaboration with the recovery funding and clean-up efforts by managing CAPRI insurance, FWS and FEMA claims, while working with DWR, CCC and the Spillway Contractors to help clean up the site.

This 120-acre Park in Oroville, CA that sits on the Feather River was developed in 2003 by MDG and was completely flooded in 2017 when the Oroville Dam Spillway failed. Since then, MDG went through Phase 1 and Phase 2, where we installed a new amphitheater that will withstand any flood, as did the structures of 2003.

The two phases cover approximately 36 acres and include the following:

  • new boat launch
  • new beach/waterfront
  • picnic and play
  • dog park renovation
  • new amphitheater with shelter
  • play structure repair
  • water play area
  • three multi-use sports fields
  • boulder climbing structures
  • disc golf course

SPLASH PARK

Quigley Park, Fresno

In 2018, MDG began work with the City of Fresno to create a Master Plan for the newly proposed Quigley Community Park. Through community workshops and public outreach, we were able to clarify the needs of the local community and evaluate park features and layout.

The process was tailored to meet as many of the Proposition 68 grant requirements as possible and focused primarily on the following elements:

  1. Leading Outreach and Community Planning events using local organizations such as CNC. Meetings were spread throughout the design process to provide multiple times and locations for the public to provide design input.
  2. Creating impactful gathering areas and designing the park to meet the themes of “Community” and “Family” while providing play, education and socialization for all ages with inclusive design.
  3. Providing a sustainable design including water saving, turf reduction, carbon sequestration with tree planting and use of Bio-carbon in the soil. (LEED Certification and SITES Initiative)
  4. Aided in the CCNR Grant Program (Prop 68) and Prop 84 Grant Program processes.
  5. Preparing cost estimates to meet the grant maximum and phasing as needed for the project.